2004-05
Bldg Room Type Comments:
Functional/Aesthetic
004 Computer Lab/Classroom OK/OK
005 Classroom OK/Mix of furniture
006 Education Lab (storage) No Report
015 Lab No Report
032 Lab No Report
033 Lab Window shades broken/Mix of furniture; stained ceiling tiles
039 Classroom OK/Mix of furniture
041 Classroom Needs new projection screen/Mix of furniture;
stained ceiling tiles
123 Classroom Broken
shades; window air conditioner noisy
and inadequate/OK
009 Lab No Report
010 Lab No Report
014 Biology Lab Fume hood inoperative/OK
015 Botany Lab OK/Missing floor tiles
016 Storage No Report
017 Lab No Report
024 Biology Lab OK/OK
026 Botany Lab OK/blinds damaged
027 Botany Lab OK/OK
032 Classroom OK/OK
033 Classroom No podium/OK
102 Classroom OK/blinds damaged
109 Planetarium No Report
112 Theater-style Lecture Rm OK/OK
115 Prep Room No Report
126 Lab No Report
127 Language Lab OK/OK
128 Physics Lab Broken blackboard; ceiling leak/needs paint
130 Computer Lab No Report
131 Classroom OK/OK
132 Classroom Floor needs repair/unmatched paint (two colors)
133 Classroom Floor needs repair/unmatched paint (two colors)
202 Seminar Room OK/Carpet needs to be cleaned
203 Lab Roof
leaks in 3 places; doorknob falls off
(safety)/badlyneeds paint; base molding is loose
205 Dark
Room Ceiling
leaks and has fallen in near door; light
fixture near door has been flooded by leak and
does not work
207 Lab No Report
208 Lab Fume hood inoperative (CRITICAL)/needs paint
213 Lab 3
of 6 fume hoods inoperative (CRITICAL);
circuit breaker inoperative; Delamination of desktops/needs paint
216 Lab No
water in an entire row of lab desks;
(CRITICAL);
no gas in 3 fixtures; counter-tops
have degraded; oak laminate is separating; 3
fume hoods inoperative (CRITICAL)
217 Lab Roof
leaks in 2 places; Air conditioner and
dehumidifier needed to insure proper operation
of NMR instrument (CRITICAL)/ceiling stains;
base molding coming loose
218 Chemistry
Classroom Loose floor
tiles; 1 blackboard will not stay up; 1
ceiling leak/baseboard coming loose from wall;
needs paint
219 Chemistry Classroom OK/baseboard molding coming loose from wall
101 Classroom Ceiling hanging loose in places/water damage and
stains on walls; carpets worn, torn and stained;
exposed light bulbs; needs paint
201 Classroom No Report
108 Classroom Heat in room
becomes uncontrollably hot;
overcrowded with furniture/OK
109 Classroom Inadequate lighting/needs paint
111 Classroom No Report
113 Classroom Lights
controlled in other rooms; inadequate
heating and A/C/needs paint
Lobby Choral
Room Trip
risk on torn carpeting; inadequate lighting;
inadequate and noisy window air conditioning
208 Storage No Report
210 Classroom No Report
001 Classroom No Report
002 Classroom No Report
003 Classroom No Report
004 Classroom No Report
006 Classroom No Report
012 Computer Classroom OK/OK
015 Computer Classroom OK/OK
016 Writing Lab OK/OK
122 Conference Room OK/OK
150 Teleconference Room OK/carpet stained/shabby; needs paint
154 Art Gallery OK/OK
241 Media Room OK/OK
Theater Unsafe plumbing and
electrical issues require
renovation; lighting is inadequate
Conference Room No Report
Classroom No Report
001 Classroom No Report
003 Instrumental Room No Report
006 Instrumental Room No Report
010 Voice Room No Report
011 Organ/Piano Room No Report
012 Instrumental Room No Report
016 Voice Room No Report
020 Computer Music Rm No Report
021 Classroom No Report
023 Voice Room No Report
024 Instrumental Room No Report
025 Instrumental Room No Report
101 Seminar Room OK/OK
102 Seminar Room Blinds broken/OK
105 Seminar Room OK/carpet ripped
106 Seminar Room OK/OK
201 Classroom No podium/needs new carpet
203 Classroom OK/filthy carpets; needs paint; delaminated desks
301 Classroom Very cold in winter/OK
303 Classroom OK/OK
104 Classroom
116 Computer Classroom
117 Dark Room
120 Sculpture Studio
202 Printmaking Room
203 Design Room
208 Drawing Room
209 Painting Room